BREW HOUSE




Centrespace were engaged by the main contractor, Kingerlee Homes to provide a robust temporary works design to support the existing façade wall during demolition.
​
The existing wall was out of plumb by approximately 150mm at eaves and the property boarded Goldsmith Lane which remained open throughout construction.
​
It was paramount that the wall remained stable throughout the process to avoid any road closures and allow for safe construction of the rest of the main build.
​
To minimize the amount of temporary works required, the façade retention relied on the existing walls to remain, along with a new braced temporary tower structure. The wall was monitored throughout construction and upon completion readings showed that the wall had not moved during the building process.
​
Main contractor and developer – Kingerlee Homes